| Following damage to some cladding, Waterrail were invited to tender for the repairs. |
 |
| Impact damaged claddings and blockwork wall removed. A new galvanised steel base angle was bedded in aquapol mastic then hammer fixed into the existing concrete slab and new heavy weight matching profiled GRP translucent panels fitted. |
|
|